RTI
related Information about Projects implemented by Non-Odia Contractors /
Agencies in Odisha
(from
2016 to 2022)
Prepared by :
Team of “Mo DALA” , Political Party,
Odiha, Bhubaneswar
|
Name of Office |
Date of information obtained |
Name of Non-Odia Agency / |
Year of Execution |
Name of the project |
Total fund awarded ( In Rs. crores ) |
|
P.H. |
|||||
|
Superintendent Engineer , P.H. Division, Sambalpur |
18.7.22 |
Petrichor |
2015-16 |
Construction |
0.69 |
|
Do |
Do |
Bansal |
2015-16 |
Diversion |
6.70 |
|
DO |
DO |
Bansal Infrastructure , Raipur |
2017-18 |
Construction |
21.47 |
|
DO |
DO |
Bansal |
2015-16 |
Water |
10.00 |
|
DO |
DO |
Ghanashyam Agrawal, Rajnandgaon, Chhatisgarh |
2017-18 |
New |
5.36 |
|
DO |
DO |
Balaji |
2017-18 |
Laying |
10.56 |
|
DO |
DO |
Balaji |
2018-19 |
Improvement |
9.28 |
|
DO |
DO |
P.G. |
2018-19 |
Construction |
11.43 |
|
DO |
DO |
Prem Construction Co. Jaipur, Rajasthan |
2020-21 |
Provision |
11.29 |
|
DO |
DO |
M/S |
2016-17 |
Integrated |
5.59 |
|
DO |
DO |
M/S |
2016-17 |
Construction |
6.09 |
|
DO |
DO |
M/S |
2015-16 |
Construction |
11.46 |
|
DO |
DO |
M/S |
2017-18 |
Improvement |
9.57 |
|
Superintending |
20.7.22 |
M/S |
2017-18 |
Automation |
16.54 |
|
DO |
DO |
M/S |
2019-20 |
Supply |
18.29 |
|
DO |
DO |
M/S |
2019-20 |
Consultancy |
0.89 |
|
DO |
DO |
M/S |
2020-21 |
Setting |
3.00 |
|
Executive Engineer, Public Health Division, Balasore |
14.7.22 |
Nortech |
2017-18 |
Improvement |
8.02 |
|
DO |
DO |
M/S |
2016-17 |
Improvement |
13.31 |
|
DO |
DO |
M/S |
2017-18 |
Improvement |
18.11 |
|
DO |
DO |
M/S |
2019-20, |
Improvement |
16.97 |
|
DO |
DO |
Tata |
2018-19 |
Improvement |
3.07 |
|
DO |
DO |
Tata |
DO |
DO |
8.74 |
|
DO |
DO |
M/S |
DO |
Improvement |
1.10 |
|
DO |
DO |
M/S |
2017-18 |
Improvement |
5.76 |
|
Superintending Engineer, Public Health Division,Rayagada |
6.7.22 |
M/s |
2022-23 |
Augmentation |
30.07 |
|
DO |
DO |
M/S |
2021-22 |
Supply |
0.90 |
|
Executive Engineer, PH Division, Koraput |
6.8.22 |
M/S |
2020-21 |
Laying |
1.09 |
|
DO |
DO |
M/S |
2020-21 |
Construction |
2.51 |
|
DO |
DO |
M/S |
2020-21 |
Construction |
2.71 |
|
DO |
DO |
M/S |
2018.19 |
Consultancy |
0.11 |
|
Superintending Engineer, P.H. Division, Bhanjanagar |
9.9.22 |
M/S |
2016-17 |
Supply |
1.14 |
|
DO |
DO |
M/S |
2017-18 |
Augmentation |
7.18 |
|
DO |
DO |
Stum |
2018-19 |
Construction |
1.34 |
|
DO |
DO |
Stum |
2019-20 |
Construction |
0.46 |
|
DO |
DO |
M/S |
2021-22 |
Supply D.I. Iron Pipes for water supply in different ULBs under PH Division, Bhanjanagar |
7.71 |
|
OWSSB, Bhubaneswar |
13.7.22 |
M/S VA TECH WABAG , Chennai |
2013-14 to 2022-23 |
Construction of new Sewage |
267.69 |
|
DO |
16.7.23 |
IPWT |
2015 |
Manufacturing |
0.50 |
|
DO |
DO |
M/S |
2015-16 |
Manufacturing |
13.47 |
|
DO |
DO |
M/S |
2015-16 |
Preparation |
0.29 |
|
DO |
DO |
M/S |
2017-18 |
Preparation |
0.80 |
|
DO |
DO |
M/S |
2018-19 |
Preparation |
0.38 |
|
Odisha Water Supply and Swerage Board, Sambalpur |
12.7.23 |
M/S |
2017 |
Construction |
150.00 |
|
Odisha Water Supply and Swerage Board, Bhubaneswar |
16.7.22 |
Iron Triangle Ltd. , Rajkot, Gujurat |
2017 |
Integrated sewerage System of Bhubaneswar City |
206.71 |
|
DO |
DO |
Laxmi |
2017 |
Integrated sewerage System of Bhubaneswar |
173.08 |
|
DO |
DO |
Eureka |
2019 |
Repair |
1.77 |
|
DO |
DO |
Eureka |
2016 |
Operation |
2.44 |
|
DO |
DO |
Eureka |
2017 |
Diversion |
3.04 |
|
DO |
DO |
Eureka |
2017 |
Diversion |
2.47 |
|
DO |
DO |
Eureka |
2018 |
Repair and maintenance of sewerage system of Puri Town |
2.95 |
|
DO |
DO |
Eureka |
|
Operation |
1.77 |
|
DO |
DO |
M/S |
2016 |
Construction |
2.59 |
|
DO |
DO |
M/S |
2016 |
Laying |
1.71 |
|
DO |
DO |
TATA |
2017 |
Construction |
345.37 |
|
DO |
DO |
Laxmi |
2018 |
Construction |
62.23 |
|
|
|
51 outside |
|
Total |
1531.62 |
|
Bhubaneswar Municipal Corporation |
|||||
|
BMC, Bhubaneswar |
19.7.22 |
Sri |
2021 |
Construction |
0.83 |
|
BMC |
30.10.23 |
NBCC |
|
Rangamatia |
55.67 |
|
Rourkela Municipal Corporation |
19.10.23 |
M/S Chhand |
|
Affordable |
32.50 |
|
DO |
DO |
Bridge & Roof Company |
|
Mandap |
17.40 |
|
R & B ( Department of Works ) |
|||||
|
Superintending |
15.12.22 |
Brijesh |
2017-18 |
Construction |
35.75 |
|
Rourkela |
15.7.22 |
M/S |
2021-22 |
Development |
5.1 |
|
NAC, |
19.7.22 |
Energy |
2019-20 |
Retrofitting |
1.05 |
|
DO |
DO |
Surya |
2020-21 |
Street |
2.10 |
|
Executive Engineer , Bhubaneswar ( R&B) Division-V, Bhubaneswar |
27.7.22 |
M/S Larse and Turbo Construction Ltd. |
2015 |
Construction of High Rise Multistoried Office Building in Unit-V, |
124.00 |
|
Executive |
29.7.22 |
Bridge |
2018-19 |
Construction |
116.92 |
|
DO |
DO |
M/S |
2016-17 |
Construction |
120.74 |
|
DO |
DO |
M/S |
2021-22 |
Improvement of six laning road from Sishubhawan square to Biju Patnaik Park |
9.69 |
|
Engineer-in-Chief |
DO |
M/S |
2016 |
Strengthening |
84.50 |
|
DO |
DO |
M/S |
2016 |
Strengthening |
|
|
DO |
DO |
M/S |
2016 |
Strengthening |
98.00 |
|
DO |
DO |
M/S |
2016 |
Strengthening |
170.00 |
|
DO |
DO |
M/S |
2016 |
Strengthening |
98.00 |
|
DO |
DO |
M/S |
2016 |
Strengthening |
115.00 |
|
DO |
DO |
M/S |
2016 |
Strengthening |
115.00 |
|
Executive |
13.1.23 |
B.P. Construction |
2022 |
Construction of G+5 cancer Care centre , Baragarh |
71.14 |
|
DO |
DO |
Suresh |
2016 |
Construction |
27.88 |
|
DO |
DO |
Suresh |
2016 |
Construction |
13.34 |
|
DO |
DO |
MS. |
2016 |
Construction |
40.21 |
|
Executive |
30.7.22 |
Engineering Project ( India) Limited |
2016-17 |
Construction of District Head |
92.92 |
|
DO |
DO |
M/S |
2018 |
Construction |
31.74 |
|
Executive |
22.7.22 |
Iron |
2016 |
Rehabilitation |
229.11 |
|
DO |
DO |
M/S |
2016 |
Widening to |
215.18 |
|
DO |
DO |
Rasmaran |
2019-20 |
Strengthening |
11.21 |
|
DO |
DO |
M/S BMS Project |
2019-20 |
P.R. |
11.89 |
|
DO |
DO |
M/S |
2022-23 |
Construction |
79.82 |
|
Superintendent |
8.12.22 |
Saraswati |
2015 |
Widening |
39.68 |
|
DO |
DO |
Herculers Struicture |
2018-19 |
Structural |
5.75 |
|
DO |
DO |
Tansaan |
2022-23 |
Improvement |
19.68 |
|
Superintending |
14.7.22 |
S.P.Singh |
2016 |
Construction |
28.50 |
|
DO |
DO |
M/S Larson & Tourbo Ltd. |
2022 |
Construction of ;post graduate Institute & Medical Research, |
235.08 |
|
Superintending Engineer, Panikoili ( R&B) , Division, Jajpur |
13.7.22 |
M/S L&T Construction , Chennai |
2021 |
Construction of 100 seated new Govt. medical College and Hospital , |
651.00 |
|
DO |
DO |
Canara Lighting Industries Pvt. Ltd. , Bangalore |
2022 |
Construction |
3.35 |
|
DO |
DO |
Matu |
2022 |
Construction |
9.80 |
|
DO |
DO |
M/S |
2022 |
Construction of 150 bedded MCH Building at Jajpur out of OMBADC Fund |
60.85 |
|
DO |
DO |
Iron |
2022 |
Construction |
87.27 |
|
Superintending |
2.7.22 |
Shapoorji |
2020-21 |
|
680.00 |
|
Executive |
20.7.22 |
Iron |
2015-16 |
Widening |
120.55 |
|
Office |
22.7.22 |
S.P.Singh |
2015-16 |
Construction |
142.41 |
|
Superintending |
6.7.22 |
Brijesh |
2015 |
Construction |
35.74 |
|
Superintending |
14.7.22 |
M/s Mohan Poddar, Dist-Korba, Chhatishgarh |
2020 |
Construction of Oldage |
28.29 |
|
Engineering-in-Chief, |
6.7.22 |
Lekon |
2015 |
Improvement of Road to Ramanguda-Katiki-Rayagada dist |
21.14 |
|
DO |
DO |
Sundeep |
DO |
Improvement |
38.78 |
|
DO |
DO |
M/S |
2016 |
Construction |
152.84 |
|
DO |
DO |
Iron |
2017 |
Construction |
28.46 |
|
DO |
DO |
M/s |
2018 |
Construction |
40.11 |
|
DO |
DO |
M/S |
2018 |
Construction |
34.71 |
|
DO |
DO |
M/S |
2018 |
Construction |
126.81 |
|
DO |
DO |
M/s |
2018 |
Improvement |
12.00 |
|
DO |
DO |
M/s |
2018 |
Improvement |
14.22 |
|
DO |
DO |
M/S |
2018 |
Construction |
114.59 |
|
DO |
DO |
M/S |
2019 |
Construction |
254.62 |
|
DO |
DO |
L&T Pvt. Ltd. |
2020 |
Construction of H.L.Bridge over |
189.97 |
|
DO |
DO |
M/S |
2021 |
Construction |
69.73 |
|
DO |
DO |
Bekem |
2021 |
Construction |
114.91 |
|
DO |
DO |
Takhyasila |
2021 |
Construction |
|
|
DO |
DO |
Bekem |
2022 |
Construction |
48.44 |
|
Superintending |
10.6.22 |
M/S |
2021-22 |
Construction |
6.87 |
|
Executive |
11.7.22 |
Sundeep |
2016 |
Improvement |
42.40 |
|
DO |
DO |
Lekcon |
2016 |
W/S |
18.54 |
|
DO |
DO |
R &R Infra Ltd. , AP |
2016 |
W/S |
19.52 |
|
DO |
DO |
M/S |
2016 |
Construction |
3.84 |
|
DO |
DO |
DO |
|
Improvement |
5.00 |
|
DO |
DO |
S.V.S. Mookambika Construction Pvt. Ltd. |
2016 |
Construction |
7.08 |
|
DO |
DO |
M/S |
2016 |
Construction |
3.32 |
|
DO |
DO |
M/S |
2017 |
Widening |
6.33 |
|
DO |
DO |
DO |
DO |
Widening |
7.96 |
|
DO |
DO |
DO |
2020 |
W/S Gunupur-Gajapati border via-Puttasingh-Tolona Road |
14.52 |
|
DO |
DO |
DO |
2022 |
Improvement |
5.00 |
|
DO |
DO |
M/S |
2021 |
Improvement |
37.39 |
|
Superintending |
13.7.22 |
M/S |
2021-22 |
Construction |
2.29 |
|
DO |
DO |
DO |
DO |
Construction |
2.20 |
|
Executive |
12.7.22 |
Backbone |
2015 |
Widening and strengthening of existing single lane to double lane from KM 140/900 to 162/01 of NH 57 |
72.85 |
|
Chief |
25.7.22 |
M/S Hyderabad |
2015 |
Widening to two lane |
277.00 |
|
DO |
DO |
Ramsaran |
2020 |
Strengthening to NH |
16.48 |
|
DO |
DO |
Patil |
2015 |
Widening |
114.03 |
|
DO |
DO |
Brijesh |
2021 |
Construction |
154.00 |
|
Superintending |
29.8.22 |
TATA |
2017 |
Construction |
381.78 |
|
Superintending |
6.9.22 |
M/S |
2015 |
Widening |
35.70 |
|
DO |
DO |
M/S |
2017 |
Widening |
17.02 |
|
DO |
DO |
M/S |
2018 |
Construction of 100 seated |
220.00 |
|
DO |
DO |
M/S |
2020-21 |
Construction |
60.49 |
|
DO |
DO |
M/S |
2021-22 |
Construction |
29.67 |
|
DO |
DO |
M/S |
2022-23 |
Construction |
161.15 |
|
Superintending Engineer , sonepur ( R&B) Division, |
12.4.23 |
Some Tagore |
Not |
300 |
The PIO did not supply detailed |
|
Superintending |
25.7.22 |
Debric |
2021-22 |
Construction |
0.69 |
|
DO |
DO |
Ananya |
2021-22 |
Construction |
0.57 |
|
|
|
58 companies |
|
|
|
|
Chief |
8.8.2022 |
M/S |
2015 |
Widening |
277.15 |
|
DO |
DO |
Ramsaran |
2020 |
Strengthening |
16.48 |
|
DO |
DO |
M/S |
2021 |
Construction |
154.00 |
|
DO |
DO |
M/S |
2022 |
Consultant |
196.94 |
|
DO |
DO |
Patil Regional |
2015 |
Widening |
114.03 |
|
Executive |
4.8.22 |
Engineering |
2016-17 |
Construction |
92.92 |
|
|
Total |
54 |
|
Total |
8000.00 |
|
|
|||||
|
Superintending |
25.7.22 |
M/S |
|
Two |
8.25 |
|
Executive Engineer, RWSS, Keonjhar |
30.7.22 |
L&T Construction Water & Effluent Treatment , Chennai, Tamil |
2021-21 |
Mega PWS Project to village |
130.00 |
|
DO |
DO |
L&T Construction Water & Effluent Treatment , Chennai, Tamil |
2018-19-2022-23 |
Mega PWS project to Champua, Jhumpura , Keonjhar , Bansapal block of |
558.00 |
|
DO |
DO |
L&T Construction Water & Effluent Treatment , Chennai, Tamil |
2020-21 to 2022-23 |
Mega PWS Scheme to Telkoi , |
300.00 |
|
DO |
DO |
L&T Construction Water & Effluent Treatment , Chennai, Tamil |
2019-20 |
Mega Water Supply under Boudh |
500.00 |
|
DO |
DO |
L&T Construction Water & Effluent Treatment , Chennai, Tamil |
2021-22 |
Mega Water Supply under |
271.82 |
|
Superintendent |
20.7.22 |
Kapil Construction Ltd. |
2020-21 |
Water |
6.00 |
|
EIC, |
14.7.22 |
M/S Larsen & Tourbo Ltd. , |
2015-16 |
Execution of 5 no. of Individual mega |
327.30 |
|
DO |
DO |
DO |
2017-18 |
Execution |
360.00 |
|
DO |
DO |
M/s |
2017-18 |
Execution |
558.28 |
|
DO |
DO |
M/S Larsen & Tourbo Ltd. , |
DO |
Execution of 5 no. of Individual mega |
370.00 |
|
DO |
DO |
M/S |
DO |
Execution |
316.53 |
|
DO |
DO |
GVPR Engineers Ltd. , Hyderabad |
DO |
Execution |
387.59 |
|
DO |
DO |
M/S Larsen & Tourbo Ltd. , |
2018-19 |
Execution of 2 no. of Individual mega |
350.27 |
|
DO |
DO |
GVPR Engineers Ltd. , Hyderabad |
2018-19 |
Execution |
555.42 |
|
DO |
DO |
M/S JMC |
2018-19 |
Execution |
315.20 |
|
DO |
DO |
Larsen and Tourbo Ltd. , Chennai |
2018-19 |
Execution of 1 no. of Individual mega |
427.59 |
|
DO |
DO |
M/S |
2018-19 |
Execution |
754.00 |
|
DO |
DO |
Larsen and Tourbo Ltd. , Chennai |
2018-19 |
Execution of 1 no. of Individual mega |
430.00 |
|
DO |
DO |
M/s |
2018-19 |
Execution |
701.00 |
|
DO |
DO |
M/s Larsen and Tourbo Ltd., |
2018-19 |
Execution of 1 no. of Individual mega |
979.82 |
|
DO |
DO |
M/s Larsen and Tourbo Ltd., |
2019-20 |
Execution of 1 no. of Individual mega |
464.02 |
|
DO |
DO |
M/s Larsen and Tourbo Ltd., Chennai |
2019-20 |
Execution of PWS to 9 GPs of |
96.60 |
|
DO |
DO |
M/S |
2019-20 |
Execution |
109.45 |
|
DO |
DO |
M/s |
2019-20 |
Execution |
248.40 |
|
DO |
DO |
M/S |
2019-20 |
Execution |
149.12 |
|
|
|
M/S |
2019-20 |
Execution |
156.75 |
|
DO |
DO |
M/s |
2019-20 |
Execution |
494.73 |
|
DO |
DO |
M/S |
2019-20 |
Execution |
349.69 |
|
DO |
DO |
M/S |
2019-20 |
Execution |
333.88 |
|
|
|
M/S |
2019-20 |
Execution |
163.62 |
|
DO |
DO |
M/s |
2019-20 |
Execution |
641.57 |
|
DO |
DO |
M/S |
2019-20 |
Execution |
429.86 |
|
DO |
DO |
M/s |
2019-20 |
Execution |
320.11 |
|
|
|
|
2019-20 |
Execution |
340.39 |
|
DO |
DO |
M/s |
201-20 |
Execution |
450.14 |
|
DO |
DO |
M/s Larsen & Toubro Ltd., Chennai |
2019-20 |
Execution of Mega PWS Scheme |
1176.49 |
|
DO |
DO |
M/S |
2019-20 |
Execution |
530.87 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
194.92 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
134.82 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
211.86 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
177.83 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
188.39 |
|
DO |
DO |
M/s |
2020-21 |
Execution of Rural PWS Scheme pertaining to Bheden |
215.31 |
|
DO |
DO |
M/s Larsen & Turbo Ltd., Chennai |
2020-21 |
Execution of Rural PWS |
508.75 |
|
DO |
DO |
M/s |
2020-21 |
Execution of 3 no. of RPWS Project pertaining to Koraput and Malkangiri district |
258.67 |
|
DO |
DO |
M/S |
2020-21 |
Execution |
296.23 |
|
DO |
DO |
M/S Megha Engineering & Infrastructure |
2020-21 |
Execution |
245.98 |
|
DO |
DO |
M/S |
2020-21 |
Execution |
254.27 |
|
DO |
DO |
M/s |
2020-2`1 |
Execution |
185.92 |
|
DO |
DO |
M/S Larsen & Toubro Ltd. |
2020-21 |
Execution of 2 no. of Rural PWS Scheme pertaining to Chilika, Tangi, Banapur Block and Khorda, Jatni block of Khorda district |
348.10 |
|
DO |
DO |
M/S |
2020-21 |
Execution |
45.58 |
|
DO |
DO |
M/s |
2021-22 |
Execution of Rural PWS Scheme pertaining to Lepripara, Tangarpali, Sundargarh, |
786.66 |
|
DO |
DO |
M/s |
2021-22 |
Execution of Rural PWS Scheme pertaining to Bisra, Lathikata, Lahunipada and Banei |
388.81 |
|
DO |
DO |
M/s |
2021-22 |
Execution |
275.40 |
|
DO |
DO |
M/s |
2021-22 |
Execution |
622.13 |
|
DO |
DO |
M/s Larsen & Turbo Ltd., Chennai |
2021-22 |
Execution of 2 NO. of Mega |
657.57 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
298.70 |
|
DO |
DO |
M/s |
2021-22 |
Execution of 3 NO. of Mega |
462.49 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
325.76 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
188.19 |
|
DO |
DO |
M/S |
2020-21 |
Execution |
215.31 |
|
DO |
DO |
M/s Larsen & Turbo Ltd., Chennai |
2020-21 |
Execution of Mega PWS Scheme |
508.75 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
258.67 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
245.98 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
254.27 |
|
DO |
DO |
M/s |
2020-21 |
Execution |
185.92 |
|
DO |
DO |
M/s Larsen & Turbo Ltd., Chennai |
2020-21 |
Execution of 2 no. of |
348.10 |
|
DO ========= |
DO |
M/s Larsen & Turbo Ltd., Chennai |
2020-21 |
Execution of 2 no. of |
227.91 |
|
DO |
DO |
M/S |
2020-21 |
Execution |
45.58 |
|
DO |
DO |
M/s |
2020 |
Execution |
275.40 |
|
DO |
DO |
M/s |
2020 |
Execution |
622.13 |
|
DO |
DO |
M/S |
2020 |
Execution |
298.70 |
|
DO |
DO |
M/s |
2020 |
Execution |
462.49 |
|
DO |
DO |
M/S |
2020 |
Execution |
325.76 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
350.22 |
|
DO |
DO |
M/s |
2021-22 |
Execution |
410.95 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
549.79 |
|
DO |
DO |
M/S |
2021-22 |
Executing |
169.66 |
|
DO |
DO |
M/S |
2021-22 |
Executing |
186.69 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
369.12 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
394.76 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
183.24 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
360.12 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
190.18 |
|
DO |
DO |
M/S |
2021-22 |
Execution |
206.94 |
|
DO |
DO |
M/S |
2022-23 |
Execution |
377.23 |
|
DO |
DO |
M/S |
2022-23 |
Execution |
151.43 |
|
Sperintending |
15.7.22 |
GVPR |
2019-20 |
Rural |
603.44 |
|
Superintending |
7.7.22 |
M/s |
2019 |
Mega |
335.72 |
|
DO |
DO |
DO |
2019 |
PWS |
181.78 |
|
DO |
DO |
M/S |
2021 |
PWS to Dharmashala and Rasulpur Block of Jajpur district |
167.17 |
|
DO |
DO |
DO |
2021 |
Mega |
93.59 |
|
DO |
DO |
M/S |
2018 |
PWS |
46.19 |
|
DO |
DO |
DO |
2019 |
PWS |
79.85 |
|
DO |
DO |
DO |
2019 |
PWS |
107.00 |
|
Superintending Engineer, RWSS, Boudh |
28.6.22 |
L &T Construction Ltd. |
2019-20 |
Mega |
224.71 |
|
DO |
DO |
L &T Construction Ltd. |
DO |
Mega |
273.71 |
|
DO |
DO |
L &T Construction Ltd. |
DO |
Mega |
271.82 |
|
Executive |
9.8.22 |
Larsen and Toubro Construction Ltd. , Chennai |
2019-20 |
Mega |
412.42 |
|
DO |
DO |
Larsen and Toubro Construction Ltd. , Chennai |
2018-19 |
Execution of Individual ROPWS project pertaining to Kendrapara, Jharsuguda , Angul district |
76.80 |
|
DO |
DO |
NCC |
2018-19 |
Mega |
332.93 |
|
DO |
DO |
NCC |
2018-19 |
Mega |
368.93 |
|
Superintending |
8.9.22 |
M/S Larsen and Toubro Ltd. |
2016-17 |
Mega |
69.69 |
|
DO |
DO |
M/S |
2018-19 |
Mega |
754.00 |
|
DO |
DO |
M/S |
2019-20 |
Execution |
681.00 |
|
DO |
DO |
M/S |
2020-21 |
Execution |
324.25 |
|
|
|
17 companies |
|
Total |
35,237.84 |
|
Housing and Urban Development |
|||||
|
Bhubaneswar Smart City Limited |
21.9.22 |
Badri |
2017 |
Multi-level |
28.87 |
|
DO |
DO |
Badri |
2017 |
Multi-level |
43.85 |
|
DO |
DO |
M/S |
2018 |
MSI |
696.85 |
|
DO |
DO |
M/S |
2018 |
ATCS |
14.69 |
|
DO |
DO |
M/S |
2018 |
Public cycle sharing project |
5.00 |
|
DO |
DO |
M/S |
2018 |
Public cycle sharing project |
2.50 |
|
DO |
DO |
Dhani |
2018 |
Public cycle sharing project |
2.50 |
|
DO |
DO |
M/S URC Construction Pvt. Ltd. |
2019 |
New BMC Building |
73.20 |
|
DO |
DO |
M/S |
2020 |
CITIIS Programme |
42.25 |
|
Municipality, Keonjhar |
16.8.22 |
WAPCOS |
2019 |
Development of Hand Ball ground adjacent to Indor Stadium , Keonjhar |
3.26 |
|
DO |
DO |
DO |
2019 |
Development of Hadabandhu Tank |
6.67 |
|
DO |
DO |
DO |
2019 |
Development of Badapokhari Tank |
7.37 |
|
Municipal Council, Barbil, |
26,7,22 |
ALFA |
2019-20 |
Procurement of Twin Shaft |
0.33 |
|
DO |
DO |
Continental |
2019-20 |
Procurement of TATA Super |
0.45 |
|
DO |
DO |
Agrawal |
2019-20 |
Procurement of plastic |
0.04 |
|
DO |
DO |
E.G. |
2019-20 |
Procurement of electronic |
0.014 |
|
|
|
|
|
|
|
|
Bhubaneswar Municipal Corporation |
19.7.22 |
Birendra Kumar Gupta |
2021 |
Construction and Commissioning of Wood based Human |
0.83 |
|
Bhubaneswar Development Authority |
13.7.22 |
M/S MALAR URC INFRA JV, Chennai |
2017-18 |
Construction of rehabilitation project for slum settlement under HFA |
85.00 |
|
DO |
DO |
M/S |
2018-19 |
|
0.85 ctore |
|
DO |
DO |
M/S |
2018-19 |
Design, supply and installation , operation and maintenance of Children play equipment |
0.50 crore |
|
DO |
DO |
M/S Bridge and Roof Co. India |
2020-21 |
Construction of Inter-state Bus terminal at Baramunda |
180.00 |
|
DO |
DO |
M/S NCC Ltd. Bhubaneswar |
2018 |
Construction of LIG Houses at Subudhipur, |
199.64 |
|
DO |
DO |
M/S |
2017 |
Commercial-cum-Residential Building |
61.19 |
|
DO |
DO |
M/S |
2017 |
Residential Complex, at Kalinganagar, ( K9B) `Bhubaneswar |
29.42 |
|
H&UD Dept. |
20.8.22 |
CENTRE FOR ENVIRONMENT AND DEVELOPMENT THIRUVANANTHAPU RAM, KERALA |
2015 onwards |
CONTRACT FOR ESTABLISHMENT AND OPERATIONALIZATION OF CITY MISSION MANAGEMENT UNITS IN 9 URBAN LOCAL BODIES ODISHA UNDER THE ATAL MTSSION FOR REJUVENATION AND URBAN TRANSFORMATION (AMRUT) |
6.17 |
|
Dhamanagar |
29.7.22 |
Energy Efficiency Services Ltd. |
2019-20 |
Public Street Lighting Project |
1.05 |
|
|
|
Surya Roshini Lighting Project Ltd. |
2020-21 |
|
1.14 |
|
WATCO |
|||||
|
WATCO Project Division, Rourkela |
16.7.22 |
IONEX |
2017-18 |
Septage Treatment Project at Rourkela City |
1.90 |
|
DO |
DO |
Larsen &Tubro Limited |
2017-20 |
Construction of Sewerage System for Rourkela City |
340.20 |
|
WATCO Project Division, Bhubaneswar -II |
DO |
M/S |
2017-18 |
Improvement of Water supply to |
14.14 |
|
DO |
DO |
M/S |
2021-22 |
Provision of leak detection Instrument |
41.97 |
|
WATCO, Bhubaneswar |
12.7.22 |
Elico |
2020-21 |
Supply, installation of Mobile laboratories for testing of drinking water quality |
1.21 |
|
DO |
DO |
Enzen |
2020-21 |
Supply and installation of 15 |
12.87 |
|
DO |
DO |
Enzen |
2020-21 |
Supply and installation of 15 |
69.41 |
|
DO |
DO |
M/S |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
82.46 |
|
DO |
DO |
M/s |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
69.41 |
|
DO |
DO |
East |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
72.79 |
|
DO |
DO |
M/s |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
103.85 |
|
DO |
DO |
M/S |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
90.46 |
|
DO |
DO |
M/S |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
73.76 |
|
DO |
DO |
M/S |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
76.93 |
|
DO |
DO |
RSC |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
85.91 |
|
DO |
DO |
Rajkamal |
2020-21 |
Improvement of Water supply to provide safe and clean drinking |
67.03 |
|
DO |
DO |
Donear |
2021-22 |
Supply of Dress for sanitation |
0.71 |
|
DO |
DO |
Enzen Global |
2021-22 |
Supply and installation of 15 |
18.04 |
|
DO |
DO |
Enzen Global |
2021-22 |
Supply and installation of 15 |
18.04 |
|
DO |
DO |
M/s |
2021-22 |
Supply of wader for sanitation |
0.28 |
|
DO |
DO |
Enzen Global |
2022-23 |
Supply and installation of 15 |
14.05 |
|
DO |
DO |
Balaji |
2020-21 |
24×7 Water supply to Puri Town under Drink from Tap Mission |
22.88 |
|
DO |
DO |
EUREKA |
2021-22 |
Operation and Maintenance of Existing Sewerage system of different areas under WATCO Mission , ( Baliapanda, |
1.15 |
|
DO |
DO |
EUREKA |
2021-22 |
Operation and Maintenance of Existing Sewerage system of different areas under WATCO Mission , Chakratirtha, Puri |
0.78 |
|
DO |
DO |
Pooja |
2021-22 |
Operation of STP , P7 & Septage Treatment Plant under WATCO , Puri |
0.59 |
|
DO |
DO |
Pooja |
2021-22 |
Construction of all intermediate sewerage pumping station , Puri |
1.25 |
|
DO |
DO |
Pooja |
2021-22 |
Annual Opeartion &Maintenance for 129 MLD WTP at CDA |
1.56 |
|
DO |
DO |
MS |
2021-22 |
Design, Construction , Testing of 2 Nos. RCC EST of capacity at Laxmi |
6.33 |
|
DO |
DO |
Kariwala |
2022-23 |
Provision for construction of a ESR for Totagopinath Zone , Puri |
6.29 |
|
DO |
DO |
RSC |
2022-23 |
Laying and replacement of rising main along Kathajodi river side for |
10.18 |
|
DO |
DO |
M/S |
2022-23 |
Laying and replacement of rising main along Kathajodi river side for |
12.11 |
|
DO |
DO |
Balaji |
2022-23 |
Conversion of intermittment |
37.14 |
|
DO |
DO |
ADVANCED |
2022-23 |
Procurement & Installation of Benteley Open flows Water GEMS with 30 days training program |
0.21 |
|
DO |
DO |
Kariwala |
2022-23 |
Construction of ESR along with Kathajodi rising Main for improvement of Intermittent |
11.51 |
|
DO |
DO |
Kariwala |
2022-23 |
Design, Construction , Testing and Commissioning of RCC ESR of |
6.80 |
|
General Manager, WATCO |
8.9.22 |
M/S |
2017 |
Design Engineering Procurement |
0.93 |
|
DO |
DO |
M/S |
2017 |
Development of Water supply |
318.00 |
|
DO |
DO |
M/S |
2021 |
Improvement of W/S to provide |
85.91 |
|
DO |
DO |
M/S |
2021 |
Improvement of W/S to provide |
67.03 |
|
Health |
|||||
|
CDMO, Ganjam |
13.10.22 |
Security |
2015-2022 |
Nirmal Security Service |
6.3 |
|
DO |
DO |
EXIMUS |
2015-2022 |
Nirmal Laundry Service |
0.30 |
|
DO |
DO |
Global Health Care System Pvt. Ltd. , Kolkata, west Bengal |
2015-2022 |
Digital Dispensary |
1.80 |
|
DO |
DO |
Karuna |
2019-2022 |
PHC (N) Management under PPP |
2.10 |
|
CDMO, Puri |
14.11.22 |
Spandan |
2018-19 to 2022-23 |
MRI/CT |
13.00 |
|
DO |
DO |
Global |
2019-20 to 2022-23 |
Digital Dispensary |
0.32 |
|
DO |
DO |
RAHI |
2018-19 to 2022-23 |
DIALYSIS |
3.00 |
|
DO |
DO |
TECHMED |
2018-19 to 2022-23 |
High End Pathology |
1.70 |
|
DO |
DO |
Krishna |
DO |
X-Ray |
0.92 |
|
DO |
|
|
|
|
|
|
Rural Development Dept. (Rural Works) |
|||||
|
Superintending Engineer, R.W. Division, Anand Pur, Keonjhar |
7.7.22 |
M/S |
2015 to 2022 |
Construction of H.L.Bridge over |
21.66 |
|
Superintending Engineer, R.W. Division, Jaleswar |
20.7.22 |
Sibaram |
2018-19 |
Construction and Maintenance of |
1.76 |
|
DO |
DO |
Anil |
2018-19 |
Construction and Maintenance of |
2.00 |
|
Superintending Engineer, R.W. Division,-II, Ganjam |
22.7.22 |
M/S |
2019-20 |
ADB PWD Road to Ankuli |
25.00 |
|
DO |
DO |
M/S VBR Infratech India Pvt. Ltd. |
2017-18 |
HL Bridge over river Bahuda connecting to village Parasambha |
10.28 |
|
DO |
DO |
DO |
2022-23 |
HL Bridge over karkhai Nullah |
7.41 |
|
Superintending Engineer, Rural Works |
16.7.22 |
Cyber |
2020-21 |
Procurement of supply / delivery |
0.11 |
|
DO |
DO |
AIMIL |
2020-21 |
Procurement of supply / delivery |
0.05 |
|
DO |
DO |
Complete |
2020-21 |
Procurement of supply / delivery |
0.66 |
|
DO |
DO |
Branzo |
2021-22 |
Construction and Maintenance of |
3.18 |
|
Executive Engineer, Rural Works Division, Rajyagada |
26.7.22 |
M/S |
2019-20 |
PWD Road to Munda via Munikhal Sakata |
4.63 |
|
Superintending Engineer, Rural Works Division, Rourkela |
12.8.22 |
M/S |
2016-17 |
Road from Santoshpur to Pahadatota |
3.73 |
|
DO |
DO |
M/S |
2018-19 |
Road from fakirmunda to Bimlagarh |
1.20 |
|
DO |
DO |
M/S |
2020-21 |
Road from Biramitra Pur to Bhadarpur |
1.86 |
|
DO |
DO |
DO |
2020-21 |
Road from Lathikata Timijore to Telitola |
3.00 |
|
Superintending Engineer, Rural Works , Rairang Pur |
29.7.22 |
M/S |
2021-22 |
Road from Gorumahasini to Bahala block boundary Guhaldanri, Suriyagada |
12.48 |
|
Chief Construction Engineer , Baripada |
28.9.22 |
M/S |
2016-17 |
Construction of H.L. |
13.91 |
|
DO |
DO |
M/S |
2019-20 |
Construction of bridge over Budhabalanga on Bhaliadiha to Gendapokhari road |
13.99 |
|
DO |
DO |
M/S |
2018-19 |
HL Bridge over Budhabalanga at 9.75 km on NH-5 -Budhakhamari -Jamdapal |
13.81 |
|
DO |
DO |
Bridge |
2016-17 |
Construction of H.L. Bridge |
6.66 |
|
DO |
DO |
M/S |
2021-22 |
Road fro Manikpur to Jharkhand |
6.15 |
|
DO |
DO |
M/S |
2021-22 |
Road from Gurumahisani to |
12.46 |
|
DO |
DO |
Saptastee Construction Ltd. |
2022-23 |
ODR to Kendumundi via Madarangajodidiha telipasala road |
4.56 |
|
Superintending Engineer, Rural works |
8.9.22 |
Mars |
|
Construction of bridge |
12.43 |
|
Superintending Engineer, Rural Works Division, Dhenkanal |
30.6.22 |
Bridge |
2021 |
Preparation of DPR including alignment |
12.92 |
|
Executive Engineer, Rural Works Division, Puri |
4.8.22 |
M/s Development Engineers Corporation Ltd. West Bengal |
2015 to 2019 |
PMGSY Package No 26-140 |
1.33 |
|
DO |
DO |
M/s Development Engineers Corporation Ltd. West Bengal |
2015 |
PMGSY Package No 26-ABD -103 |
1.74 |
|
Dept. of Handicrafts |
|||||
|
Director of Handicrafts , |
29.7.22 |
Engineering |
2022 |
Construction of Common Facility Centre |
11.41 |
|
DO |
DO |
Engineering |
2022 |
Construction of Craft Tourism Centre ( CTC) |
2.92 |
|
State Institute For Development |
22.7.22 |
M/S |
2021-22 |
SANKALP Kendrapara Project |
0.05 |
|
DO |
DO |
M/S |
2021-22 |
DO |
0.22 |
|
DO |
DO |
M/S |
2022-23 |
DO |
0.40 |
|
DO |
DO |
M/S |
2019-20 |
DO |
0.09 |
|
Department |
|||||
|
TPSODL |
26.7.22 |
Bhanwariya |
2021-22 |
11 KV & 33 KV Project service work |
45.60 |
|
DO |
DO |
Surya Construction Company , New Delhi |
DO |
DO |
1.00 |
|
DO |
DO |
G.V. |
DO |
DO |
0.50 |
|
DO |
DO |
Shyam |
DO |
DO |
2.00 |
|
DO |
DO |
D&B |
DO |
DO |
1.00 |
|
Green Energy Development Corporation ( Subsidiary Company of OHPC) |
8.7.22 |
Bharat |
2014-15 – continuing |
20 MW Solar Photovoltaic Grid Connected Power Plant at village |
159.60 |
|
DO |
DO |
Sun |
2020-21 |
8 MW Grid connected SPP at 5 different location inside Odisha |
31.50 |
|
DO |
DO |
Azure |
2016-17 |
4Bmw Rooftop Project ( Cuttack and Bhubaneswar) |
— |
|
TPNODL , Balasore |
7.7.22 |
Akanksha |
2018 |
CAPEX Programme |
2.75 |
|
DO |
DO |
Akanksha |
DO |
DO |
1.23 |
|
DO |
DO |
M/S |
2021 |
DO |
2.50 |
|
DO |
DO |
M/S |
2021 |
DO |
9.00 |
|
DO |
DO |
M/S |
2021 |
CAPEX |
6.00 |
|
DO |
DO |
M/S |
2021 |
CAPEX |
5.50 |
|
DO |
DO |
M/S |
2021 |
do |
5.00 |
|
DO |
DO |
M/S |
2021 |
CAPEX |
3.00 |
|
DO |
DO |
M/S |
2021 |
CAPEX |
5.00 |
|
|
|
M/S |
2021 |
CAPEX |
8.50 |
|
DO |
DO |
M/S |
2021 |
CAPEX |
5.00 |
|
DO |
DO |
M/S |
2021 |
CAPEX |
5.00 |
|
DO |
DO |
M/S |
2021 |
CAPEX |
2.00 |
|
DO |
DO |
W.S. |
2018 |
do |
2.66 |
|
Odisha Coal and |
5.7.22 |
M/S |
2017 |
Construction of 8.0 MTPA Coal Handling Plant with allied |
514.00 |
|
DO |
DO |
M/S |
2019 |
Construction of 33/ 6.6 KV Sub station |
25.80 |
|
DO |
DO |
M/S |
2018 |
Construction of 33 KV Double |
7.12 |
|
DO |
DO |
M/S |
2018 |
Construction of Manoharpur |
117.12 |
|
DO |
DO |
M/S |
2017 |
Construction of Rehabilitation and resettlement Colony at Hemgiri , |
35.97 |
|
DO |
DO |
M/S |
2018 |
Development, Operation, Maintenance |
|
|
OPTCL, |
6.7.22 |
M/S |
2016-2021 |
Works under IPDS |
407.00 |
|
DO |
DO |
M/S Larsen and Toubro Ltd. |
2016-22 |
DO |
214.82 |
|
DO |
DO |
M/s |
2018-21 |
Metering work under IPDS ( |
41.86 |
|
DO |
DO |
M/s |
2018-19 |
DO |
67.61 |
|
DO |
DO |
M/s |
2016-21 |
Works under DDUGJY |
364.40 |
|
DO |
DO |
M/S Larsen and Toubro Ltd. |
DO |
DO |
293.12 |
|
DO |
DO |
M/s |
2018-21 |
Metering work under DDUGJY |
303.59 |
|
DO |
DO |
M/S |
DO |
DO |
36.70 |
|
DO |
DO |
M/S |
2015-16 |
132/33kv s/s Ghens and its associated transmission line , Unit-VIII, |
132.31 |
|
DO |
DO |
M/S |
DO |
400/220KV GJS S/S , Lapanga |
78.44 |
|
DO |
DO |
M/S |
DO |
220 Pratasasan -Pandiabili Transmission line |
28.00 |
|
DO |
DO |
M/S |
DO |
Grid S/S , Godachaka with its |
41.11 |
|
DO |
DO |
M/S |
DO |
220/33 kv GIS S/S , Keonjhar |
41.94 |
|
DOI |
DO |
M/S |
DO |
132/33KV GIS S/S , Khuntuni |
33.91 |
|
DO |
DO |
M/S |
2016-17 |
132/33KV, GIS S/S , Chandabali |
35.80 |
|
DO |
DO |
M/S Larsen Toubro Ltd. |
DO |
400 KV Vedanta -Lapanga DC Line |
29.19 |
|
DO |
DO |
M/S |
2017-18 |
400/220 GIS S/S , Meramunduli -B |
127.48 |
|
DO |
DO |
M/S |
DO |
220/132 KV Grid S/S Balimunda , Dhamra |
70.50 |
|
DO |
DO |
M/S |
DO |
Diversion of 400 KV Meramunduli-Duburi DC Line |
14.48 |
|
DO |
DO |
M/S |
2018-19 |
133/33 kv GIS S/S , Hirakud |
34.01 |
|
DO |
DO |
M/s |
DO |
133/33 kv GIS S/S , Lamtaput |
22.62 |
|
DO |
DO |
M/S |
DO |
220 KV LILO Line from 220 Theruavali -Narendra Pur DC |
39.08 |
|
DO |
DO |
M/S |
DO |
133/33 kv gis s/s Line, |
28.72 |
|
DO |
DO |
M/S |
DO |
220/132 KV Grid S/S Balichandra Pur and its associated transmission |
34.77 |
|
DO |
DO |
M/s |
2019-20 |
420 KV Bus reactor at Mendhasala , Meeramunduli and New Duburi |
39.59 |
|
DO |
DO |
M/S |
2020-21 |
132 KV SC Line to RTSS, |
3.29 |
|
DO |
DO |
M/S |
2021-22 |
220 KV Ersama -Paradeep Line |
233.35 |
|
DO |
DO |
M/S |
2021-22 |
220 KV Ersama -Pratap Sasan Line |
244.14 |
|
DO |
DO |
Larsen and Turbo Limited, Chennai |
2015 |
Odisha Distribution System strengthening Project |
574.00 |
|
DO |
DO |
Larsen and Tourbo Limited |
2016 |
DO |
348.97 |
|
DO |
DO |
DO |
DO |
Puri Nabakalebara Project |
164.27 |
|
DO |
DO |
Sterling |
DO |
DO |
125.72 |
|
DO |
DO |
M/S |
2016 |
Odisha Distribution System strengthening Project |
381.00 |
|
DO |
DO |
Gupta |
2016 |
DO |
108.75 |
|
DO |
DO |
M/s |
DO |
DO |
102.65 |
|
Executive |
7.7.22 |
M/S |
2016-17 |
Re-drilling upward, cleaning |
1.29 |
|
Odisha Power |
1.8.22 |
Various |
2015-16 to 2022-23 |
Order value granted to |
521.00 |
|
TPSODL, |
2.12.23 |
M/s |
2023 |
Engineering Supply, Erection, Commissioning of 33/11 kv |
208.79 |
|
DO |
DI |
M/S |
2023 |
Engineering Supply, Erection, Commissioning of 33/11 kv |
190.99 |
|
DO |
DO |
DO |
2023 |
Engineering Supply, Erection, Commissioning of independent 33/11 kv |
46.75 |
|
DO |
DO |
M/S |
2022 and 2023 |
System Improvement works in 106 |
31.75 |
|
DO |
DO |
M/S |
2023 |
Off-Grid ( Solar) |
25.43 |
|
Dept. of Agriculture |
|||||
|
Directorate of Soil |
21.7.22 |
ICARDA |
2018-19 to 2020-21 |
Spineless cactus in hilly / |
11.99 |
|
DO |
DO |
DO |
2017-18 |
Enabling Small Holders produce |
14.94 |
|
Asst. Director of Hort., Patnagarh |
DO |
Sikkim |
2021-22 |
Adoption and Certification of Organic Farming for 300 HA in Odisha ( |
0.21 |
|
APICOL, Odisha |
20.7.22 |
PRADAN |
2019-20 and 2020-21 |
Agriculture Entrepreneur Promotion Scheme |
1.14 |
|
DO |
DO |
WASSAN, |
2022-23 |
DO |
0.84 |
|
DO |
DO |
Palladium |
2021-22 |
Pradhan Mantri formalization of |
3.71 |
|
Dept. of Forest and Environment |
|||||
|
State Pollution Control Board |
16.7.22 |
M/S |
2016-17 to 2021-22 |
Continuous Ambient Air Quality Monitoring System |
1.81 |
|
DFO, Mahanadi Wildlife |
19.7.22 |
Verdin |
2020-21 |
Eco-Tourism |
0.05 |
|
|
|
|
|
|
|
|
Department of Fisheries and ARD |
|||||
|
Executive Engineer, Fishery Engineering Division, Cuttack |
18.7.22 |
Construction |
2020-21 |
M/s National Projects Construction Corporation Limited |
9.36 |
|
DO |
DO |
Renovation |
2020-21 |
M/s National Projects Construction Corporation Limited |
40.00 |
|
SC &ST Development Department |
|||||
|
OPELIP |
14.7.22 |
Intellectual |
2019-20 |
Installation of Network connectivity |
0.14 |
|
DO |
DO |
PRADAN, |
2019-20 |
Strengthening community based institution and field personnel through Capacity Building |
0.32 |
|
DO |
DO |
International |
2020-21 |
Capacity Building Support for |
1.56 |
|
DO |
DO |
Indian |
2020-21 |
Support for Knowledge Management |
0.29 |
|
DO |
DO |
International |
2021-22 |
Capacity Building Support for restoring degraded landscape for improving livelihood |
2.47 |
|
DO |
DO |
Indian |
2021-22 |
Support for Knowledge Management |
0.25 |
|
DO |
DO |
DO |
2022-23 |
DO |
0.01 |
|
ITDA, Malkangiri |
26.7.23 |
M/S |
2016 |
Installation of Cashew Processing |
0.11 |
|
DO |
DO |
Golden |
2019 |
Supply of Stainless steel Boiler |
0.70 |
|
DO |
DO |
Garden |
2016 |
Erection of Bailley Bridge at |
4.83 |
|
DO |
DO |
Khalsa |
2019 |
Supply of Open Gym Equipments |
2.24 |
|
ITDA, Bhawanipatna |
5.8.22 |
Swaraj |
2015 |
Stem Based Cooking System for |
1.41 |
|
OBCC |
|||||
|
OBCC |
21.7.22 |
URC Construction Pvt. Ltd, Bangalore, Karnataka |
2021-22 |
Construction of Netaji Bus Terminal |
84.00 |
|
DO |
DO |
Bhumiputra |
2021-22 |
Providing Design consultancy and Project supervision |
4.80 |
|
DO |
26.8.22 |
M/S |
2021-22 and 2022-23 |
Construction of Shree Setu & extension of Musa River (Phase-1) at Puri on Lump Sump Turnkey Basis |
74.94 |
|
DO |
DO |
TAC Design | Supervision |
2021-22 |
Providing Project |
0.95 |
|
DO |
27.2.22 |
M/S URC ( Universal |
2022-23 |
Development of |
114.20 |
|
Odisha Construction Corporation ( OCC), Bhubaneswar |
|||||
|
OCC, Bhubaneswar |
23.8.22 |
MARS Planning & Engineering Services Pvt.Ltd., Jharkhand |
2020-21 |
Appointment of project Management Consultant (PMC) for implementation of Mega lift projects in clusier-lV |
2.45 |
|
DO |
DO |
MARS Planning & Engineering Services Pvt.Ltd., Jharkhand |
2020-21 |
Appointment of project Management Consultant (PMC) for implementation of Mega lift projects in clusier-V |
2.74 |
|
DO |
DO |
M/S Ocean Sparkle Limited , Andhra Pradesh |
2019-20 |
Dredging & removal of Shoal No.-1 at upstream of Mahanadi barrage and disposal of dredged materials within 2.5 KM |
48.91 |
|
DO |
DO |
M/S Ocean Sparkle Limited , Andhra Pradesh |
2019-20 |
Dredging & removal of Shoal No.-1 at upstream of Mahanadi barrage and disposal of dredged materials within 2.5 KM |
68.90 |
|
DO |
DO |
M/S Ocean Sparkle Limited , Andhra Pradesh |
2019-20 |
Dredging & s(A), 5(8),6(4) Mahanadi & Birupa dredged materials within 2.5 km through |
31.10 |
|
DO |
DO |
Signet Enertech Pvt. Ltd. , Maharastra |
2020-21 |
Laying of (1) 150 GSM non-woven Geo- Cementious Geo-Synthetic Cr Mattress (CGCM) (Between RD 750 Mtr RD 1500 Mtr ‘of Taladanda Main Canal |
0.60 |
|
DO |
DO |
Signet Enertech Pvt. Ltd. , Maharastra |
2020-21 |
Laying of (1) 150 GSM non-woven Geo- Cementious Geo-Synthetic Cr Mattress (CGCM) (Between RD 750 Mtr RD 1500 Mtr ‘of Taladanda Main Canal |
0.59 |
|
DO |
DO |
M/s Damodar Ropeways Infra Ltd. ,Kolkatta |
2015-16 |
Design, manufacture, supply, erection, |
9.85 |
|
DO |
DO |
SSNR Project Pvt. Ltd , Visakhapatnam, AP |
2020-21 |
Construction of Bridge across Kuanpada Nallah in the reservoir Area of Chhetigada irrigation Project. |
9.52 |
|
DO |
DO |
Alpha Pacific |
2021-22 |
$supply, remote control |
3.14 |
|
DO |
DO |
Multi Mantech Ltd (MMtpL), |
2017-18 |
Proof |
2.45 |
|
DO |
DO |
M/S Kypipe |
2018-19 |
Preparation of |
0.14 |
|
DO |
DO |
Sir Mohan Nair |
2020-21 |
Construction, |
3.35 |
|
DO |
DO |
M/S SSNR |
2014-15 TO 2021-22 |
Construction of Of lower Suktel, irrigation .Project: Balangir |
38.61 |
|
DO |
DO |
|
do |
Construction of Balangir |
39.21 |
|
|
|
M/S Ratna |
2018-19 |
Lower Suktel |
19.30 |
|
|
|
Bridge and Roof |
2020-21 |
Construction of periphery road, |
14.34 |
|
OSDMA |
|||||
|
OSDMA |
22.7.22 |
M/S |
2015-2018 |
Construction of MFS at Balia , |
2.80 |
|
DO |
DO |
M/S |
2015-2017 |
Construction of MFS in Ganjam district ( 19 project ) |
23.43 |
|
|
|
|
|
|
|
|
Department of Food Supply and Consumer Welfare |
|||||
|
Dept. of FS &CW |
12.7.22 |
M/S |
2016-17 to |
Fare Price Shop Automation ( |
69.78 |
|
|
|
|
|
|
|
|
Electronics and Information Technology Dept. |
|||||
|
DTET, Odisha |
12.7.22 |
M/S Larsen & Tubro Ltd. |
2020-21 |
Centre of excellence on 400 KV EHV Transmission |
4.90 |
|
DO |
DO |
M/S |
2020-21 |
Centre of Excellence on Advanced wielding with Thermal cutting at ITI |
4.45 |
|
DO |
DO |
M/S |
2021-22 |
Centre of excellence on |
4.48 |
|
DO |
DO |
M/S |
2021-22 |
Supply of digital contents ( |
5.78 |
|
DO |
DO |
M/S |
2021-22 |
Design, Engineering supply , |
4.30 |
|
DO |
DO |
M/S |
2022-23 |
DO |
4.86 |
|
DO |
DO |
M/S |
2022-23 |
DO |
3.99 |
|
Department of Panchayat Raj |
|||||
|
DRDA, Jajpur |
22.6.22 |
EDCIL |
2020-21 |
Setting up Smart Classes in |
1.78 |
|
DO |
DO |
Tsar |
2022-23 |
Tasar Sericulture and |
0.90 |
|
Panchayat Raj Dept |
24.8.22 |
Xeam |
2022-23 |
SPMU Management |
1.08 |
|
Zilla parishad, Kondhamal |
27.7.22 |
M/s. Genii Engineering & Hyderabad-500062, Telengana |
2018-19 |
execution of LED Street Lighting for the year 2018-19 |
2.29 |
|
IDCO, Odisha |
|||||
|
IDCO, Bhubaneswar |
4.822 |
D. Thakkar Construction Pvt. Ltd. , Nagpur , |
2015 |
Construction of Building of |
9.56 |
|
DO |
DO |
Viswa Infra |
2015 |
Providing, Laying & Testing |
35.62 |
|
DO |
DO |
M/s |
2015 |
Providing, Laying & Testing |
21.26 |
|
DO |
DO |
M/S CMM Infra Projects Ltd. , Indore |
2015 |
Additional Work of OCAC Tower |
0.45 |
|
DO |
DO |
M/S |
2016 |
Construction of Shakti |
81.29 |
|
DO |
DO |
M/s |
2017-18 |
Relaying of Synthetic Athletic |
0.53 |
|
DO |
DO |
M/S |
2018-19 |
Construction of Primary Processing Centre for sea food park at Chhatrapur, Ganjam |
3.06 |
|
DO |
DO |
M/S |
2018-19 |
Design, engineering, Supply, installation , testing and Commissioning of Computerised Musical dancing fuctain installed on floating platform at Kusuma Lake , Jajpur |
5.12 |
|
DO |
DO |
M/s |
2018-19 |
Interior Electrification Works |
0.93 |
|
DO |
DO |
M/S |
2018-19 |
Construction of primary |
3.47 |
|
DO |
DO |
Maruti |
2019-20 |
Detail design, construction , testing |
5.88 |
|
DO |
DO |
M/S |
2019-20 |
Construction of Modular |
0.34 |
|
DO |
DO |
M/s |
2020-21 |
Laying of Synthetic athletic |
4.72 |
|
DO |
DO |
M/S |
2020-21 |
Fire fighting and fire alarm system |
3.88 |
|
DO |
DO |
Sainath Enviro-Tech |
2021-22 |
Design, supply , installation, |
2.29 |
|
DO |
DO |
M/S Larsen and Toubro Ltd. , Chennai |
2021-22 |
Construction of sports infrastructure facilities |
363.00 |
|
DO |
DO |
M/S |
2021-22 |
Supply, fitting & fixing |
2.49 |
|
DO |
DO |
M/S |
2021-22 |
Construction of SFRC pre-cast, pre-tensioned Compound wall for MSME |
0.96 |
|
DO |
DO |
M/S |
2021-22 |
Construction of 18 No. of synthetic Turf Hockey Training centre at 16 locations in Sundargarh district , Chhatrapur and Ganjam district |
140.80 |
|
DO |
DO |
M/S |
2021-22 |
Construction of Accommodation Building ( Hostel) for players and support staff in BPUT campus , Rourkela |
53.00 |
|
DO |
DO |
M/S |
2021-22 |
Construction of Diamond Jublee Administrative-cum-academic Building |
33.20 |
|
DO |
17.6.22 |
M/S |
2021-22 |
Re-Development of Kalinga |
119.75 |
|
DO |
DO |
M/S |
2017-18 |
Rendering Art and Crafts work for Krushi Bhawan at Bhubaneswar |
0.77 |
|
DO |
DO |
M/S |
2016-17 |
Planning , Designing & |
0.26 |
|
DO |
DO |
M/S |
2014-15 onwards |
Supply, Installation, Commissioning |
6.28 |
|
DO |
DO |
M/S |
2015-16 |
Staege Lighting System if |
0.55 |
|
DO |
DO |
M/S |
2019 |
Design, Manufacture, supply, installation , testing of Multi level over ground puzzle type |
8.39 |
|
DO |
DO |
M/S |
2018-19 |
Modernisation of kone |
0.62 |
|
DO |
DO |
M/S |
2019-20 |
Construction of E-substation cable laying for power supply to electronics park at Infocity-II , Janla , Dist-Khorda |
12.29 |
|
DO |
DO |
M/S |
2019-20 |
SITC of Air Conditioning and |
3.47 |
|
DO |
DO |
M/S |
2022-23 |
SITC system including operation |
5.93 |
|
DO |
DO |
M/S |
|
SITC of 6 Nos 16 passenger and |
|
|
DO |
DO |
Gannon |
2016 |
Construction of Paradeep |
74.08 |
|
DO |
DO |
LLOYED |
2019 |
Architectural Planning, design construction and warehouse unit |
11.75 |
|
DO |
DO |
M/S Soft tech India Pvt. Ltd. , Maharastra |
2015 |
Diamond Core Drilling |
53.40 |
|
DO |
DO |
M/S |
2021 |
Roida C Iron and Manganese |
18.32 |
|
DO |
DO |
M/S |
2022 |
Diamond Core Drilling |
28.91 |
|
OREDA ( Odisha Renewable Energy Development Agency ) |
|||||
|
OREDA, Bhubaneswar |
11.7.22 |
Price |
2020-21 |
Preparation of project Proposal |
3.98 |
|
DO |
DO |
Span |
2015 |
Solar pump for Drinking Water ( 715 project ) |
31.81 |
|
DO |
DO |
Jain |
2015 |
Solar pump for Drinking Water ( 118 project ) |
5.25 |
|
DO |
DO |
Waree |
2015 |
Solar pump for Drinking Water ( 85 project ) |
3.78 |
|
DO |
DO |
DO |
2016-17 |
Solar pump for Drinking Water ( 48 project ) |
2.23 |
|
DO |
DO |
DO |
2017-18 |
Solar pump for Drinking Water ( 20 project ) |
0.86 |
|
DO |
DO |
Gupta |
2019-20 |
Solar pump for Drinking Water ( 102 |
2.67 |
|
DO |
DO |
DO |
2019-20 |
Solar pump for Drinking Water ( 184 project ) |
4.82 |
|
DO |
DO |
Shakti |
2019-20 |
Solar pump for Drinking Water ( 135 project ) |
3.53 |
|
DO |
DO |
Shakti Pump India Ltd. |
2018-19 |
Solar Pump for Irrigation , Sourajalanidhi ( 653 project ) |
3.54 |
|
DO |
DO |
DO |
2016-17 |
Solar Pump for Irrigation (NSM) |
0.40 |
|
DO |
DO |
Gupta |
2018-19 |
Solar Pump for Irrigation (NSM) |
0.84 |
|
Odisha Mining Corporation |
|||||
|
OMC, Bhubaneswar |
4.8.22 |
M/s |
2022 |
Excavation, Cutting and |
46.60 |
|
DO |
DO |
DO |
2013-14 to |
Excavation, Cutting and |
41.15 |
N.B- This is
not complete information. Effort
to get more information is in process . The objective
of putting this
information in public domain is
to awaken Odias how their resources
are being systematically looted by
Non-Odia Contractors at the cost
of Odia Contractors by few Non-Odia
officers posted in the office
of Chief Minister. The Time has come
for Odia people
to awaken and
fight for their
self-esteem and dignity and for a corruption-free pro-people governance
system in the state.